In the acclaimed post-apocalyptic civilization revival strategy game Revive: three advanced mechanical modules are embedded in the center of my player board and are fully inserted with power chips. May I ask, after all three levels of machines are powered on, will an additional full-board main control electric switch overload be triggered?