In the complex strategy master Vital Lacerda's "Kanban EV": the boss lady supervisor Sandra inspects the Design Department in clockwise order. If I only have unverified sketches on hand and no design blueprints that have been inspected on the test track, how many work performance points (PP) will Sandra deduct?